conduit

Your breaker decides how many bays you get.
Not your parking.

01

Your supply

A
ALifts, lights and geysers share it.
02

Your charger

Our pick. A tethered unit tops out at 7.4 kW.

03

How many bays

04

What you charge

You keep it.

R
What your supply runs
1
without load balancing
8
with load balancing

Each bay gets 8 A when all of them are busy, and up to 7.4 kW alone.

Your site
Charger6 × TeltoCharge EVC2 · tethered
Supply60 A per phase, three-phase
Each bay, all busy8 A · 1.8 kW
7.4 kW alone.
HardwareR77,970
InstallationR65,970
Once offR143,940
Platform, each monthR894
R149 a charger.
Driver pays Conduit15% of a session
What you earn
Your fee incomeR4,800
After the platform feeR3,906
23 sessions a month cover the platform fee.
Send this to Conduit

Monitoring is free on any charger you buy from us.

No extra box on the wall.

Runs over OCPP
No load-control hardware, no second run of wiring.
Cannot trip the breaker
One budget, divided between the bays.
Never below 6 A
The least a car accepts. A full site makes a bay wait.
A TeltoCharge on a brick wall beside its DB box, with no load-control hardware between them
A live install. The DB box is on the left.

An electrician confirms the supply first. See the chargers.